IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0101 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,444 $696 n/a
UL0101 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,055 $3,163 n/a
UL0101 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $150 n/a
UL0101 # 05 Y:1994 05 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $3,325 $10,000 n/a
UL0101 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $791 $588 n/a
UL0101 # 07 Y:1994 07 1994 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,085 $1,000 n/a
UL0101 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $463 $558 n/a
ME0134 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $300 $150 Implemented
ME0134 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,500 $1,050 Not Implemented
ME0134 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,743 $400 Implemented
ME0134 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $598 $300 Implemented
ME0134 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $546 $400 Not Implemented
AR0025 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $300 Implemented
AR0025 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,122 $1,456 Implemented
AR0025 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,184 $725 Implemented
AR0025 # 04 Y:1994 04 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $107,965 $66,000 Not Implemented
AR0025 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $9,530 Implemented
AR0025 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,863 $600 Implemented
CO0305 # 01 Y:1994 01 1994 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,210 $210,000 Implemented
CO0305 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,440 $6,760 Implemented
CO0305 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,830 $2,600 Not Implemented
CO0305 # 04 Y:1994 04 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,550 $10,000 Not Implemented
CO0305 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,270 $4,330 Not Implemented
CO0305 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,160 $590 Implemented
CO0305 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,780 $370 Implemented