Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0080 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $40 | Not Implemented |
IP0080 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $200 | $200 | Not Implemented |
IP0080 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $194 | $208 | Not Implemented |
IP0080 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,290 | $5,520 | Not Implemented |
WV0541 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,969 | $252,894 | Not Implemented |
WV0541 # 02 Y:2017 | 02 | 2017 | INSTALL SENSORS TO DETECT DEFECTS | $60,138 | $100,000 | Not Implemented |
WV0541 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $40,630 | $534 | Implemented |
WV0541 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,042 | $29,880 | Not Implemented |
WV0541 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,320 | $72,000 | Not Implemented |
WV0541 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $13,353 | $1,514 | Implemented |
WV0541 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $3,860 | $2,024 | Implemented |
WV0541 # 08 Y:2017 | 08 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,206 | $5,500 | Not Implemented |
WV0541 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $869 | $1,671 | Implemented |
MA0770 # 01 Y:2017 | 01 | 2017 | REDUCE VENTILATION AIR | $8,661 | $1,503 | Not Implemented |
MA0770 # 02 Y:2017 | 02 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $2,351 | $1,000 | Not Implemented |
MA0770 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $1,809 | $2,784 | Implemented |
MA0770 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $286 | $20 | Not Implemented |
MA0770 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $124 | $100 | Implemented |
OK0964 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,155 | $0 | Not Implemented |
OK0964 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,164 | $3,000 | Not Implemented |
OK0964 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $246 | $800 | Not Implemented |
OK0964 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,682 | $38,281 | Implemented |
OK0964 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $798 | $4,528 | Not Implemented |
OK0964 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,333 | $4,260 | Not Implemented |
OK0964 # 07 Y:2017 | 07 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,216 | $5,750 | Not Implemented |