Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0180 # 06 Y:1996 | 06 | 1996 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $1,946 | $0 | Not Implemented |
NV0063 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $200 | Implemented |
NV0063 # 02 Y:1996 | 02 | 1996 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $404 | $900 | Not Implemented |
NV0063 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,184 | $90 | Implemented |
NV0063 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $100 | $57 | Implemented |
NV0063 # 05 Y:1996 | 05 | 1996 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $228 | $180 | Not Implemented |
NV0063 # 06 Y:1996 | 06 | 1996 | INSULATE BARE EQUIPMENT | $2,375 | $1,452 | Implemented |
NV0063 # 07 Y:1996 | 07 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,535 | $5,200 | Implemented |
NV0063 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM THICKNESS INSULATION | $9,970 | $2,000 | Implemented |
NV0063 # 09 Y:1996 | 09 | 1996 | USE OPTIMUM THICKNESS INSULATION | $4,848 | $6,210 | Implemented |
NV0063 # 10 Y:1996 | 10 | 1996 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $360 | $600 | Not Implemented |
NV0063 # 11 Y:1996 | 11 | 1996 | MODIFY MATERIAL APPLICATION METHODS | $28,063 | $2,040 | Implemented |
OD0062 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,072 | $2,400 | Implemented |
OD0062 # 02 Y:1996 | 02 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,584 | $3,850 | Not Implemented |
OD0062 # 03 Y:1996 | 03 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,718 | $2,400 | Not Implemented |
OD0062 # 04 Y:1996 | 04 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $2,171 | $780 | Implemented |
OD0062 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,512 | $8,748 | Implemented |
OD0062 # 06 Y:1996 | 06 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $25,196 | $0 | Not Implemented |
NV0057 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $100 | Implemented |
NV0057 # 02 Y:1996 | 02 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $248 | $310 | Implemented |
NV0057 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $0 | Not Implemented |
NV0057 # 04 Y:1996 | 04 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $416 | $0 | Not Implemented |
NV0057 # 05 Y:1996 | 05 | 1996 | INSTALL OCCUPANCY SENSORS | $315 | $246 | Not Implemented |
NV0057 # 06 Y:1996 | 06 | 1996 | USE PHOTOCELL CONTROLS | $474 | $42 | Not Implemented |
NV0057 # 07 Y:1996 | 07 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $468 | $1,520 | Implemented |