IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0180 # 06 Y:1996 06 1996 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $1,946 $0 Not Implemented
NV0063 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $200 Implemented
NV0063 # 02 Y:1996 02 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $404 $900 Not Implemented
NV0063 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,184 $90 Implemented
NV0063 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $100 $57 Implemented
NV0063 # 05 Y:1996 05 1996 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $228 $180 Not Implemented
NV0063 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $2,375 $1,452 Implemented
NV0063 # 07 Y:1996 07 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,535 $5,200 Implemented
NV0063 # 08 Y:1996 08 1996 USE OPTIMUM THICKNESS INSULATION $9,970 $2,000 Implemented
NV0063 # 09 Y:1996 09 1996 USE OPTIMUM THICKNESS INSULATION $4,848 $6,210 Implemented
NV0063 # 10 Y:1996 10 1996 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $360 $600 Not Implemented
NV0063 # 11 Y:1996 11 1996 MODIFY MATERIAL APPLICATION METHODS $28,063 $2,040 Implemented
OD0062 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,072 $2,400 Implemented
OD0062 # 02 Y:1996 02 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,584 $3,850 Not Implemented
OD0062 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,718 $2,400 Not Implemented
OD0062 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,171 $780 Implemented
OD0062 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,512 $8,748 Implemented
OD0062 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $25,196 $0 Not Implemented
NV0057 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $100 Implemented
NV0057 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $310 Implemented
NV0057 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $0 Not Implemented
NV0057 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $416 $0 Not Implemented
NV0057 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $315 $246 Not Implemented
NV0057 # 06 Y:1996 06 1996 USE PHOTOCELL CONTROLS $474 $42 Not Implemented
NV0057 # 07 Y:1996 07 1996 INSTALL TIMERS AND/OR THERMOSTATS $468 $1,520 Implemented