IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0399 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,515 $1,717 Implemented
WV0399 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,930 $1,000 Implemented
WV0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $2,955 $3,544 Implemented
WV0399 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,309 $4,560 Not Implemented
WV0399 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,246 $26 Not Implemented
WV0399 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,498 $4,153 Not Implemented
WV0399 # 01 Y:2010 01 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $215,411 $540,000 Not Implemented
WV0399 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $154,014 $106,000 Not Implemented
WV0399 # 03 Y:2010 03 2010 COVER OPEN TANKS $83,144 $7,290 Implemented
WV0399 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,930 $39,900 Implemented
WV0399 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $18,121 $1,644 Implemented
UM0362 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,064 $1,500 Not Implemented
UM0362 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,058 $89,000 Implemented
UM0362 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,351 $500 Implemented
UM0362 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,185 $400 Implemented
UM0362 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,961 $3,048 Implemented
UM0362 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $3,523 $6,072 Not Implemented
UM0362 # 07 Y:2010 07 2010 INSTALL STORM WINDOWS AND DOORS $3,301 $3,000 Implemented
UM0362 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,257 $2,000 Implemented
MS0365 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $42,353 $102,915 Not Implemented
MS0365 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,482 $217,200 Not Implemented
MS0365 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $38,096 Implemented
MS0365 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,747 $15,590 Implemented
MS0365 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $196 Implemented
UW0034 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $120,000 $0 Not Implemented