Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50,330
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0036 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,300 | $80 | n/a |
CI0036 # 07 Y:2024 | 07 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,361 | $8,000 | n/a |
OR0801 # 01 Y:2024 | 01 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,848 | $0 | n/a |
OR0801 # 02 Y:2024 | 02 | 2024 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $42,000 | $50,000 | n/a |
OR0801 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $15,143 | $44,093 | n/a |
OR0801 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,400 | $6,763 | n/a |
OR0801 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $5,438 | n/a |
OR0801 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,884 | $92,435 | n/a |
SJ0027 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $89,704 | $333,155 | n/a |
SJ0027 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $32,211 | $22,296 | n/a |
SJ0027 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,400 | $0 | n/a |
SJ0027 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,837 | $1,550 | n/a |
SJ0026 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,177 | $9,200 | n/a |
SJ0026 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $400 | $0 | n/a |
SJ0026 # 08 Y:2024 | 08 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $4,132 | $25,650 | n/a |
SJ0026 # 09 Y:2024 | 09 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,261 | $1,017 | n/a |
SJ0026 # 10 Y:2024 | 10 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $706 | $1,151 | n/a |
SJ0026 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $79,569 | $266,719 | n/a |
SJ0026 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $653 | $607 | n/a |
SJ0026 # 03 Y:2024 | 03 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,192 | $888 | n/a |
SJ0026 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $123,957 | $18,405 | n/a |
SJ0026 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,978 | $9,706 | n/a |
UW2413 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $8,896 | $25,250 | Implemented |
UW2413 # 02 Y:2024 | 02 | 2024 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $25,793 | $13,368 | Implemented |
UW2413 # 03 Y:2024 | 03 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $20,435 | $58,800 | Implemented |