Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MUWT03 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $152 | $350 | Not Implemented |
MUWT02 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98 | $20 | Not Implemented |
MUWT02 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $294 | $0 | Not Implemented |
MUWT02 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,399 | Not Implemented |
IP0175 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM TEMPERATURE | $452 | $0 | Not Implemented |
IP0175 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $30,222 | $6,500 | Not Implemented |
IP0175 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $22,456 | $24,300 | Not Implemented |
IP0174 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $42,275 | $0 | Implemented |
IP0174 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,401 | $1,048 | Implemented |
IP0174 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $76,877 | $14,812 | Implemented |
IP0174 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,006 | $2,730 | Implemented |
IP0174 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80,518 | $123,235 | Implemented |
IP0174 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $28,594 | $78,000 | Not Implemented |
IP0173 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,485 | $0 | Not Implemented |
IP0173 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,055 | $0 | Not Implemented |
IP0173 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,365 | $840 | Not Implemented |
IP0173 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,684 | $61,320 | Not Implemented |
IP0173 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $399 | $1,042 | Not Implemented |
IP0173 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,837 | $33,000 | Not Implemented |
IC0279 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $1,455 | Implemented |
IC0279 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $2,613 | $254 | Implemented |
IC0279 # 03 Y:2023 | 03 | 2023 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $205,098 | $12,050 | Not Implemented |
IC0279 # 04 Y:2023 | 04 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $89,401 | $210,300 | Not Implemented |
IC0279 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,146 | $4,937 | Implemented |
IC0279 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $26,751 | $41,956 | Not Implemented |