Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100,077
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0601 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,225 | $3,680 | n/a |
LE0601 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $55,828 | $52,000 | n/a |
LE0601 # 05 Y:2025 | 05 | 2025 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,412 | $23,182 | n/a |
LE0601 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $636 | $1,081 | n/a |
LE0601 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,625 | $210,000 | n/a |
LE0601 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,248 | $44,740 | n/a |
LE0601 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $40,859 | $167,895 | n/a |
SD0676 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,908 | $47,771 | n/a |
SD0676 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $109,396 | $5,254 | n/a |
SD0676 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,618 | $1,911 | n/a |
SD0676 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,510 | $44,993 | n/a |
SD0676 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $0 | n/a |
SD0676 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,821 | $7,047 | n/a |
SD0676 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,684 | $2,699 | n/a |
SD0676 # 08 Y:2025 | 08 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $143,491 | $0 | n/a |
SD0676 # 09 Y:2025 | 09 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $153,587 | $200,000 | n/a |
SD0676 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,179 | $8,868 | n/a |
SD0676 # 11 Y:2025 | 11 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $2,478 | $2,050 | n/a |
AS0611 # 01 Y:2025 | 01 | 2025 | EXPAND OPERATIONS INTO UNUSED SPACE | $82,237 | $165,793 | n/a |
AS0611 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,612 | $333,378 | n/a |
AS0611 # 03 Y:2025 | 03 | 2025 | COMBINE UTILITY METERS | $12,846 | $583 | n/a |
AS0611 # 04 Y:2025 | 04 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,710 | $3,302 | n/a |
AS0611 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,182 | $4,238 | n/a |
AS0611 # 06 Y:2025 | 06 | 2025 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $82 | $100 | n/a |
IP0211 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,011 | $0 | n/a |