IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0043 # 09 Y:2009 09 2009 MOVE BOILER TO MORE EFFICIENT LOCATION $10,937 $3,000 Implemented
OR0551 # 01 Y:2009 01 2009 UPGRADE CONTROLS ON COMPRESSORS $77,191 $50,820 Implemented
OR0551 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,529 $42,146 Implemented
OR0551 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,500 $0 Not Implemented
OR0551 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $28,320 $48,980 Implemented
OR0551 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $83,890 $100,800 Implemented
MI0183 # 01 Y:2009 01 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,088 $1,360 Implemented
MI0183 # 02 Y:2009 02 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,816 $1,280 Not Implemented
MI0183 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,012 $1,200 Not Implemented
MI0183 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,501 $2,320 Not Implemented
MI0183 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,481 $320 Implemented
MI0183 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,750 $1,500 Implemented
MI0183 # 07 Y:2009 07 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $198 $180 Not Implemented
MI0183 # 08 Y:2009 08 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $60 Implemented
OK0784 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $32,802 $10,627 Implemented
OK0784 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $26,522 $23,859 Implemented
OK0784 # 03 Y:2009 03 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,003 $0 Not Implemented
OK0784 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,600 $620 Not Implemented
OK0784 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $362 $1,013 Not Implemented
OK0784 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,098 Not Implemented
OK0784 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,104 $0 Implemented
OK0784 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,788 $0 Implemented
OK0784 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $858 $990 Implemented
LL0323 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,211 $8,680 Implemented
LL0323 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,990 $990 Not Implemented