Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0043 # 09 Y:2009 | 09 | 2009 | MOVE BOILER TO MORE EFFICIENT LOCATION | $10,937 | $3,000 | Implemented |
OR0551 # 01 Y:2009 | 01 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $77,191 | $50,820 | Implemented |
OR0551 # 02 Y:2009 | 02 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,529 | $42,146 | Implemented |
OR0551 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,500 | $0 | Not Implemented |
OR0551 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $28,320 | $48,980 | Implemented |
OR0551 # 05 Y:2009 | 05 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $83,890 | $100,800 | Implemented |
MI0183 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,088 | $1,360 | Implemented |
MI0183 # 02 Y:2009 | 02 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,816 | $1,280 | Not Implemented |
MI0183 # 03 Y:2009 | 03 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,012 | $1,200 | Not Implemented |
MI0183 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,501 | $2,320 | Not Implemented |
MI0183 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,481 | $320 | Implemented |
MI0183 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,750 | $1,500 | Implemented |
MI0183 # 07 Y:2009 | 07 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $198 | $180 | Not Implemented |
MI0183 # 08 Y:2009 | 08 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $133 | $60 | Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 03 Y:2009 | 03 | 2009 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $11,003 | $0 | Not Implemented |
OK0784 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $1,600 | $620 | Not Implemented |
OK0784 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $362 | $1,013 | Not Implemented |
OK0784 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,098 | Not Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
LL0323 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,211 | $8,680 | Implemented |
LL0323 # 02 Y:2009 | 02 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,990 | $990 | Not Implemented |