IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0030 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $406 $1,181 Not Implemented
IP0030 # 09 Y:2014 09 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,765 $116,486 Not Implemented
DL0136 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $60,975 $50,000 Implemented
DL0136 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,940 $11,600 Implemented
DL0136 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,610 $1,020 Not Implemented
DL0136 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,030 $20,000 Implemented
DL0136 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,590 $0 Implemented
DL0136 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,190 $6,400 Not Implemented
WM0057 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,391 $35,000 Not Implemented
WM0057 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,441 $4,500 Not Implemented
WM0057 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $133 $122 Not Implemented
WM0057 # 04 Y:2014 04 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,200 $0 Not Implemented
WM0057 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,235 $2,200 Not Implemented
WM0057 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,046 $302 Not Implemented
WM0057 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,492 $1,470 Implemented
WM0057 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $2,825 $1,125 Not Implemented
WM0057 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,273 $9,911 Not Implemented
WM0057 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,633 $10,068 Not Implemented
WM0057 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,175 Not Implemented
WM0057 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $7,640 Not Implemented
SF0456 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,140 $0 Implemented
SF0456 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,324 $80 Implemented
SF0456 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $883 $327 Implemented
SF0456 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $114 $127 Implemented
SF0456 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $502 $638 Implemented