Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0199 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,254 | $5,975 | Implemented |
MI0199 # 08 Y:2010 | 08 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,552 | $4,531 | Implemented |
MI0198 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,683 | $55,919 | Implemented |
MI0198 # 02 Y:2010 | 02 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $37,497 | $39,695 | Not Implemented |
MI0198 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,892 | $2,000 | Implemented |
MI0198 # 04 Y:2010 | 04 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,048 | $13,338 | Implemented |
MI0198 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $5,576 | $14,400 | Implemented |
MI0198 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $1,210 | Implemented |
MI0198 # 07 Y:2010 | 07 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,644 | $11,985 | Not Implemented |
MI0198 # 08 Y:2010 | 08 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,407 | $40 | Implemented |
UF0437 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,679 | $4,000 | Not Implemented |
UF0437 # 02 Y:2010 | 02 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,263 | $4,600 | Not Implemented |
UF0437 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,562 | $5,039 | Not Implemented |
UF0437 # 04 Y:2010 | 04 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $457 | $0 | Not Implemented |
UF0437 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,443 | $4,200 | Not Implemented |
UF0437 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,608 | $469 | Not Implemented |
UF0437 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,197 | $1,979 | Not Implemented |
UF0437 # 08 Y:2010 | 08 | 2010 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $3,387 | $1,200 | Not Implemented |
UF0437 # 09 Y:2010 | 09 | 2010 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $4,523 | $0 | Not Implemented |
MI0197 # 01 Y:2010 | 01 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,798 | $2,550 | Not Implemented |
MI0197 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,774 | $1,210 | Implemented |
MI0197 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,594 | $40 | Not Implemented |
MI0197 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,824 | $7,562 | Not Implemented |
MI0197 # 05 Y:2010 | 05 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,359 | $2,850 | Not Implemented |
MI0197 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,187 | $180 | Implemented |