IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,305

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0027 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,328 $1,297 Not Implemented
IA0027 # 02 Y:1992 02 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $533 $361 Implemented
IA0027 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $191 $66 Not Implemented
IA0027 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $2,643 $3,441 Implemented
IA0027 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $172 Implemented
IA0027 # 06 Y:1992 06 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $557 $250 Not Implemented
IA0027 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $423 $600 Implemented
IA0027 # 08 Y:1992 08 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $260 $20 Implemented
IA0028 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $437 Implemented
IA0028 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,954 $1,701 Implemented
IA0028 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,105 $50 Implemented
IA0028 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $457 $344 Not Implemented
IA0028 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $97 $100 Not Implemented
IA0028 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $66 $20 Implemented
IA0028 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $2,500 Not Implemented
IA0029 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $83,615 $95,000 Implemented
IA0029 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $12,000 $482 Not Implemented
IA0029 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,915 $1,500 Not Implemented
IA0029 # 04 Y:1992 04 1992 INSTALL TURBULATORS $2,572 $4,270 Not Implemented
IA0029 # 05 Y:1992 05 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,572 $300 Not Implemented
IA0029 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,079 $100 Implemented
IA0029 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,217 $331 Implemented
IA0029 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $5,917 $10,125 Not Implemented
IA0029 # 09 Y:1992 09 1992 INSTALL SET-BACK TIMERS $3,762 $3,699 Not Implemented
IA0029 # 10 Y:1992 10 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $946 $1,800 Not Implemented