IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0430 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $841 $2,072 Not Implemented
SF0430 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $4,481 Not Implemented
SF0430 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,029 $5,603 Not Implemented
SD0466 # 01 Y:2013 01 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $66,411 $232,360 Not Implemented
SD0466 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $40,710 $144,156 Not Implemented
SD0466 # 03 Y:2013 03 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,415 $62,100 Not Implemented
SD0466 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,331 $600 Not Implemented
SD0466 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,263 $1,275 Not Implemented
SD0466 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,508 $1,300 Not Implemented
SD0466 # 07 Y:2013 07 2013 INSTALL SKYLIGHTS $867 $2,400 Not Implemented
SD0466 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $550 $740 Not Implemented
SF0429 # 01 Y:2013 01 2013 OPERATE BOILERS ON HIGH FIRE SETTING $18,109 $0 Not Implemented
SF0429 # 02 Y:2013 02 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $578 $810 Implemented
SF0429 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,006 $16,020 Not Implemented
SF0429 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $14,210 $38,634 Not Implemented
SF0429 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $9,736 $36,817 Implemented
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SF0429 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,991 $0 Not Implemented
SF0429 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $228,512 $0 Not Implemented
SD0465 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $18,166 $60,710 Not Implemented
SD0465 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,606 $29,550 Not Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented
SD0465 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $200 Implemented
SD0465 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,318 $1,521 Not Implemented
SD0465 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,113 $200 Not Implemented