IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0097 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $166,760 $6,090 Not Implemented
LM0097 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $53,375 $1,500 Implemented
LM0097 # 05 Y:2005 05 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $1,250 $0 Implemented
LM0097 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $284 $50 Implemented
LM0097 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $933 $35,082 Implemented
MI0104 # 01 Y:2005 01 2005 HEAT WATER WITH EXHAUST HEAT $315,984 $128,000 Not Implemented
MI0104 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,384 $1,300 Not Implemented
MI0104 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,889 $600 Not Implemented
MI0104 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,821 $3,010 Not Implemented
MI0104 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,246 $10,198 Not Implemented
MI0104 # 06 Y:2005 06 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,160 $5,060 Not Implemented
LE0212 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $600,960 $1,440,000 Not Implemented
LE0212 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,827 $28,400 Implemented
LE0212 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,161 $2,500 Not Implemented
LE0212 # 04 Y:2005 04 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,784 $37,000 Not Implemented
LE0212 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $9,210 $1,000 Not Implemented
LE0212 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $6,490 $1,925 Implemented
LE0212 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,111 $1,500 Implemented
LE0212 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,055 $350 Implemented
LE0212 # 09 Y:2005 09 2005 COVER OPEN TANKS $2,850 $2,274 Not Implemented
LE0212 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,712 $200 Implemented
LE0212 # 11 Y:2005 11 2005 BURN WASTE OIL FOR HEAT $1,823 $3,000 Not Implemented
IC0098 # 01 Y:2005 01 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $64,389 $324,232 Not Implemented
IC0098 # 02 Y:2005 02 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,945 $13,700 Implemented
IC0098 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,381 $0 Implemented