Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1090 # 01 Y:2023 | 01 | 2023 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $76,727 | $51,456 | Implemented |
OK1090 # 02 Y:2023 | 02 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $172 | $530 | Implemented |
OK1090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,602 | $1,797 | Implemented |
OK1090 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,316 | $3,638 | Implemented |
OK1090 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $68,844 | $438,000 | Not Implemented |
CI0015 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $88,567 | $1,500 | Not Implemented |
CI0015 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $36,511 | $165,000 | Implemented |
CI0015 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,757 | $0 | Not Implemented |
CI0015 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $3,770 | $9,000 | Not Implemented |
CI0015 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,958 | $3,500 | Not Implemented |
CI0015 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $2,700 | Not Implemented |
CI0015 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,292 | $5,000 | Not Implemented |
CI0015 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,262 | $1,310 | Not Implemented |
CM1019 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,370 | $657,982 | n/a |
CM1019 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $93,012 | $807,500 | n/a |
CM1019 # 03 Y:2023 | 03 | 2023 | INCREASE EFFICIENCY OF TRUCKS | $43,375 | $394,000 | n/a |
CM1019 # 04 Y:2023 | 04 | 2023 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $7,058 | $30,570 | n/a |
SF0601 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,057 | $0 | Implemented |
SF0601 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $1,168 | $200 | Not Implemented |
SF0601 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $80 | Not Implemented |
SF0601 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM THICKNESS INSULATION | $3,765 | $1,482 | Implemented |
SF0601 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,103 | $2,861 | Not Implemented |
SF0601 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,700 | $12,525 | Implemented |
SF0601 # 07 Y:2023 | 07 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,826 | $62,630 | Not Implemented |
SU0530 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,551 | $211 | Not Implemented |