IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0717 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,225 $0 Implemented
UD0717 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,553 $11,448 Implemented
UD0717 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,395 $0 Not Implemented
UD0717 # 09 Y:2005 09 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,658 $2,526 Implemented
UD0717 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,845 $0 Not Implemented
UD0717 # 11 Y:2005 11 2005 USE OPTIMUM THICKNESS INSULATION $1,314 $1,962 Not Implemented
UD0717 # 12 Y:2005 12 2005 INSULATE BARE EQUIPMENT $670 $780 Not Implemented
UD0717 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $441 $882 Not Implemented
MS0272 # 01 Y:2005 01 2005 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $60,336 $15,000 Not Implemented
MS0272 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,425 $3,780 Not Implemented
MS0272 # 03 Y:2005 03 2005 PAY UTILITY BILLS ON TIME $783 $0 Implemented
MS0272 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $569 $151 Implemented
MS0272 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $424 $1,495 Not Implemented
MS0272 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $153 $216 Implemented
MS0272 # 07 Y:2005 07 2005 REPAIR AND ELIMINATE STEAM LEAKS $95 $19 Implemented
TA0093 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,635 $390 Not Implemented
TA0093 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,125 $10 Not Implemented
TA0093 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,560 $0 Not Implemented
TA0093 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $0 Not Implemented
TA0093 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $1,430 Not Implemented
OK0707 # 01 Y:2005 01 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,316 $7,739 Not Implemented
OK0707 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,571 $25,675 Implemented
OK0707 # 03 Y:2005 03 2005 INSTALL SET-BACK TIMERS $4,532 $1,380 Not Implemented
OK0707 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,916 $617 Not Implemented
OK0707 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,639 $6,750 Implemented