IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0635 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,536 $1,460 Implemented
AM0635 # 04 Y:2013 04 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,130 $666 Not Implemented
AM0635 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $850 $177 Not Implemented
AM0635 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $485 $0 Implemented
AM0635 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $312 $505 Implemented
AM0635 # 08 Y:2013 08 2013 USE SYNTHETIC LUBRICANT $250 $0 Not Implemented
AM0635 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $95 Not Implemented
LE0356 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $5,175 Implemented
LE0356 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $3,215 Implemented
LE0356 # 03 Y:2013 03 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,894 $51,200 Not Implemented
LE0356 # 04 Y:2013 04 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $146 $338 Not Implemented
LE0356 # 05 Y:2013 05 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $756 $0 Implemented
LE0356 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,451 $520 Not Implemented
LE0356 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,343 $1,000 Not Implemented
LE0356 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,139 $1,500 Not Implemented
LE0356 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,341 $0 Implemented
LE0356 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,399 $3,700 Implemented
LE0356 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,608 $25,060 Not Implemented
LE0356 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,638 $1,086 Implemented
SF0430 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,421 $0 Implemented
SF0430 # 02 Y:2013 02 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,697 $768 Implemented
SF0430 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,822 $885 Implemented
SF0430 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,465 $16,491 Implemented
SF0430 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,727 $9,958 Not Implemented
SF0430 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $841 $2,072 Not Implemented