IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0520 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,809 $1,589 Implemented
WV0520 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $780 $1,156 Implemented
WV0520 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $773 $1,420 Not Implemented
WV0520 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $461 $428 Implemented
WV0520 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $384 Implemented
OR0667 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $18,192 $21,600 Not Implemented
OR0667 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,990 $8,335 Not Implemented
OR0667 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,538 $0 Implemented
OR0667 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,475 $35,460 Implemented
OR0667 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $9,526 $71,973 Not Implemented
IP0059 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $58 Implemented
IP0059 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,602 $99 Implemented
IP0059 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $76 $62 Implemented
IP0059 # 04 Y:2016 04 2016 APPLY FOR INVESTMENT INCENTIVES $1,633 $2,000 Not Implemented
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented
IP0059 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $257 $776 Not Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented
LE0411 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $21,409 $9,106 Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 07 Y:2016 07 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $1,450 $1,450 Not Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0411 # 09 Y:2016 09 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,849 $6,000 Not Implemented