IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0176 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,638 $6,572 Not Implemented
WM0176 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,301 $0 Not Implemented
LS0422 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $7,800 $0 Implemented
LS0422 # 02 Y:2022 02 2022 USE PHOTOCELL CONTROLS $1,326 $74 Implemented
LS0422 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,012 $135 Not Implemented
LS0422 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $496 $250 Implemented
LS0422 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,312 $11,682 Implemented
LS0422 # 06 Y:2022 06 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $90 $165 Implemented
LS0422 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13 $38 Not Implemented
TT0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,947 $60,000 Not Implemented
TT0268 # 02 Y:2022 02 2022 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $17,027 $10,000 Not Implemented
TT0268 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,583 $49,071 Not Implemented
TT0268 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,268 $3,480 Not Implemented
TT0268 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,223 $500 Implemented
TT0268 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,691 $2,695 Not Implemented
TT0268 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,442 $6,000 Not Implemented
MZ0315 # 01 Y:2022 01 2022 USE RADIANT HEATER FOR SPOT HEATING $15,635 $15,360 Not Implemented
MZ0315 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,404 $480 Implemented
MZ0315 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,771 $14,420 Implemented
MZ0315 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $250 Implemented
MZ0315 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,818 $360 Implemented
MZ0315 # 06 Y:2022 06 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,735 $15,782 Implemented
MZ0315 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,981 $1,350 Not Implemented
MZ0315 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $138,217 $836,000 Not Implemented
UA0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,108 $47,329 Implemented