Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0498 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $339 | $0 | Implemented |
SF0498 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,580 | $177 | Implemented |
SF0498 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,342 | $210 | Not Implemented |
SF0498 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $417 | $178 | Implemented |
SF0498 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,025 | $3,196 | Implemented |
SF0498 # 07 Y:2017 | 07 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $8,507 | $21,536 | Implemented |
SF0498 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,733 | $56,494 | Not Implemented |
SF0498 # 09 Y:2017 | 09 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,652 | $583,671 | Not Implemented |
SF0498 # 10 Y:2017 | 10 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $15,815 | $27,742 | Implemented |
UD0964 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,083 | $0 | Not Implemented |
UD0964 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $652 | $500 | Not Implemented |
UD0964 # 03 Y:2017 | 03 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,847 | $500 | Not Implemented |
UD0964 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,000 | $1,000 | Not Implemented |
UD0964 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,749 | $2,840 | Not Implemented |
UD0964 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,522 | $0 | Not Implemented |
UD0964 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,348 | $36,424 | Not Implemented |
UD0964 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,225 | $21,449 | Not Implemented |
UD0964 # 09 Y:2017 | 09 | 2017 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,075 | $0 | Not Implemented |
DL0173 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $20,880 | $0 | Implemented |
DL0173 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,435 | $15,000 | Implemented |
DL0173 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,100 | $9,375 | Not Implemented |
DL0173 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,676 | $1,375 | Implemented |
DL0173 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,364 | $654 | Not Implemented |
DL0173 # 06 Y:2017 | 06 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $17,600 | $5,950 | Implemented |
DL0173 # 07 Y:2017 | 07 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,800 | $3,940 | Not Implemented |