IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0498 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $339 $0 Implemented
SF0498 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,580 $177 Implemented
SF0498 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,342 $210 Not Implemented
SF0498 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $417 $178 Implemented
SF0498 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,025 $3,196 Implemented
SF0498 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $8,507 $21,536 Implemented
SF0498 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,733 $56,494 Not Implemented
SF0498 # 09 Y:2017 09 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $65,652 $583,671 Not Implemented
SF0498 # 10 Y:2017 10 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,815 $27,742 Implemented
UD0964 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $0 Not Implemented
UD0964 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $652 $500 Not Implemented
UD0964 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,847 $500 Not Implemented
UD0964 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $1,000 Not Implemented
UD0964 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,749 $2,840 Not Implemented
UD0964 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,522 $0 Not Implemented
UD0964 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,348 $36,424 Not Implemented
UD0964 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,225 $21,449 Not Implemented
UD0964 # 09 Y:2017 09 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $6,075 $0 Not Implemented
DL0173 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $20,880 $0 Implemented
DL0173 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,435 $15,000 Implemented
DL0173 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,100 $9,375 Not Implemented
DL0173 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,676 $1,375 Implemented
DL0173 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,364 $654 Not Implemented
DL0173 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $17,600 $5,950 Implemented
DL0173 # 07 Y:2017 07 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,800 $3,940 Not Implemented