IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0197 # 08 Y:2004 08 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $26,570 $16,638 Not Implemented
SU0197 # 09 Y:2004 09 2004 OPTIMIZE PLANT POWER FACTOR $2,001 $6,941 Implemented
SU0195 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,293 $0 Not Implemented
SU0195 # 02 Y:2004 02 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $333 $0 Not Implemented
SU0195 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,236 $1,380 Implemented
SU0195 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,836 $1,837 Implemented
SU0195 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,140 $555 Implemented
MA0559 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $239,059 $699,000 Not Implemented
MA0559 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $70,580 $123,500 Not Implemented
MA0559 # 03 Y:2004 03 2004 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $36,905 $15,475 Implemented
MA0559 # 04 Y:2004 04 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,513 $4,078 Not Implemented
MA0559 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,349 $11,346 Implemented
MA0559 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,861 $14,400 Not Implemented
MA0559 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,383 $333 Not Implemented
SU0196 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,000 $0 Implemented
SU0196 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,956 $0 Implemented
SU0196 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Not Implemented
SU0196 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $653 Implemented
SU0196 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $344 $888 Not Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented