IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0082 # 03 Y:1993 03 1993 REPAIR AND ELIMINATE STEAM LEAKS $186 $240 Implemented
AS0082 # 04 Y:1993 04 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $213 $300 Implemented
AS0082 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $703 Implemented
AS0082 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $0 Implemented
AS0082 # 07 Y:1993 07 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,635 $4,543 Implemented
AS0082 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $0 Implemented
AS0082 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490 $500 Implemented
MA0268 # 01 Y:1993 01 1993 RECOVER AND REUSE COOLING WATER $27,923 $65,033 Not Implemented
MA0268 # 02 Y:1993 02 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,788 $6,000 Not Implemented
MA0268 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,611 $13,957 Not Implemented
MA0268 # 04 Y:1993 04 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $823 $97 Not Implemented
MA0268 # 05 Y:1993 05 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,138 $0 Not Implemented
MA0268 # 06 Y:1993 06 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,927 $0 Not Implemented
MA0268 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,666 $30,813 Not Implemented
SD0051 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,002 $1,890 Implemented
SD0051 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,549 $3,320 Implemented
SD0051 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $20 Not Implemented
SD0051 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $80 Not Implemented
SD0051 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $0 Implemented
SD0051 # 06 Y:1993 06 1993 INSTALL SET-BACK TIMERS $771 $1,080 Implemented
SD0051 # 07 Y:1993 07 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,314 $2,080 Implemented
SD0051 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $907 $1,715 Not Implemented
KU0396 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $15,571 $21,400 Not Implemented
KU0396 # 02 Y:1993 02 1993 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $6,812 $6,925 Implemented
KU0396 # 03 Y:1993 03 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,811 $10,000 Not Implemented