IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0061 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,658 $2,208 Implemented
SF0061 # 05 Y:1995 05 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $733 $1,300 Not Implemented
SF0061 # 06 Y:1995 06 1995 COVER OPEN TANKS $3,373 $1,560 Not Implemented
SF0061 # 07 Y:1995 07 1995 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,048 $2,955 Not Implemented
SF0061 # 08 Y:1995 08 1995 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $2,880 $25,300 Not Implemented
SF0061 # 09 Y:1995 09 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $7,532 $1,288 Implemented
SF0061 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $10,340 $6,344 Not Implemented
UF0122 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,779 $5,399 Implemented
UF0122 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,775 $5,159 Not Implemented
UF0122 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,452 $400 Not Implemented
UF0122 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $724 $2,600 Not Implemented
UF0122 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $870 $1,000 Implemented
UF0122 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,796 $5,186 Implemented
UF0122 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $593 $500 Implemented
BD0032 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,546 $600 Not Implemented
BD0032 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,653 $3,000 Not Implemented
BD0032 # 03 Y:1995 03 1995 CONVERT TO ELECTROSTATIC POWDER COATING $40,960 $1,900 Not Implemented
BD0032 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,743 $11,340 Not Implemented
BD0032 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $20 Not Implemented
HO0099 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,584 $11,286 Implemented
HO0099 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $276 $365 Implemented
HO0099 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $95 $236 Implemented
HO0102 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $924 $200 Implemented
HO0102 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,470 $3,472 Not Implemented
HO0102 # 03 Y:1995 03 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $177,106 $600,000 Not Implemented