Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0061 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,658 | $2,208 | Implemented |
SF0061 # 05 Y:1995 | 05 | 1995 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $733 | $1,300 | Not Implemented |
SF0061 # 06 Y:1995 | 06 | 1995 | COVER OPEN TANKS | $3,373 | $1,560 | Not Implemented |
SF0061 # 07 Y:1995 | 07 | 1995 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $6,048 | $2,955 | Not Implemented |
SF0061 # 08 Y:1995 | 08 | 1995 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $2,880 | $25,300 | Not Implemented |
SF0061 # 09 Y:1995 | 09 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $7,532 | $1,288 | Implemented |
SF0061 # 10 Y:1995 | 10 | 1995 | TREAT AND REUSE RINSE WATERS | $10,340 | $6,344 | Not Implemented |
UF0122 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,779 | $5,399 | Implemented |
UF0122 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,775 | $5,159 | Not Implemented |
UF0122 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,452 | $400 | Not Implemented |
UF0122 # 04 Y:1995 | 04 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $724 | $2,600 | Not Implemented |
UF0122 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $870 | $1,000 | Implemented |
UF0122 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,796 | $5,186 | Implemented |
UF0122 # 07 Y:1995 | 07 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $593 | $500 | Implemented |
BD0032 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,546 | $600 | Not Implemented |
BD0032 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,653 | $3,000 | Not Implemented |
BD0032 # 03 Y:1995 | 03 | 1995 | CONVERT TO ELECTROSTATIC POWDER COATING | $40,960 | $1,900 | Not Implemented |
BD0032 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,743 | $11,340 | Not Implemented |
BD0032 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $392 | $20 | Not Implemented |
HO0099 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,584 | $11,286 | Implemented |
HO0099 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $276 | $365 | Implemented |
HO0099 # 03 Y:1995 | 03 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $95 | $236 | Implemented |
HO0102 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $924 | $200 | Implemented |
HO0102 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,470 | $3,472 | Not Implemented |
HO0102 # 03 Y:1995 | 03 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $177,106 | $600,000 | Not Implemented |