Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0290 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,551 | $5,861 | Implemented |
MS0290 # 06 Y:2006 | 06 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $633 | $1,350 | Not Implemented |
MS0290 # 07 Y:2006 | 07 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $355 | $236 | Implemented |
LE0231 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $140,853 | $660,000 | Not Implemented |
LE0231 # 02 Y:2006 | 02 | 2006 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $128,263 | $120,000 | Not Implemented |
LE0231 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,942 | $13,500 | Implemented |
LE0231 # 04 Y:2006 | 04 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,565 | $51,000 | Implemented |
LE0231 # 05 Y:2006 | 05 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $21,498 | $4,500 | Implemented |
LE0231 # 06 Y:2006 | 06 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $17,212 | $12,500 | Implemented |
LE0231 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $16,394 | $13,060 | Not Implemented |
LE0231 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,127 | $400 | Implemented |
LE0231 # 09 Y:2006 | 09 | 2006 | IMPROVE COMBUSTION CONTROL CAPABILITY | $7,881 | $2,500 | Implemented |
LE0231 # 10 Y:2006 | 10 | 2006 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,915 | $189 | Implemented |
LE0231 # 11 Y:2006 | 11 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,485 | $3,600 | Implemented |
LE0231 # 12 Y:2006 | 12 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,229 | $500 | Not Implemented |
LE0231 # 13 Y:2006 | 13 | 2006 | INSTALL OCCUPANCY SENSORS | $3,076 | $300 | Not Implemented |
WV0336 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,594 | $14,968 | Implemented |
WV0336 # 02 Y:2006 | 02 | 2006 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $14,092 | $25,000 | Not Implemented |
WV0336 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,454 | $1,333 | Implemented |
WV0336 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,755 | $0 | Implemented |
WV0336 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,345 | $0 | Implemented |
WV0336 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,097 | $510 | Not Implemented |
WV0336 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,688 | $231 | Implemented |
WV0336 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $796 | $189 | Implemented |
WV0336 # 09 Y:2006 | 09 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $320 | $0 | Not Implemented |