IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0565 # 05 Y:1995 05 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,570 $750 Implemented
GT0565 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $3,350 $0 Not Implemented
GT0565 # 07 Y:1995 07 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,770 $320 Implemented
GT0565 # 08 Y:1995 08 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,960 $31,380 Implemented
GT0565 # 09 Y:1995 09 1995 UPGRADE CONTROLS ON COMPRESSORS $25,500 $6,300 Not Implemented
GT0565 # 10 Y:1995 10 1995 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $272,800 $20,800 Not Implemented
GT0562 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $82,460 $0 Implemented
GT0562 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,980 $0 Implemented
GT0561 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $473,300 $1,050,000 Implemented
GT0561 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $166,370 $235,000 Not Implemented
GT0561 # 03 Y:1995 03 1995 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $99,420 $0 Not Implemented
GT0561 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,950 $4,550 Implemented
GT0561 # 05 Y:1995 05 1995 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $349,805 $1,000,000 Not Implemented
GT0561 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,730 $201,600 Implemented
GT0560 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,520 $4,860 Implemented
GT0560 # 02 Y:1995 02 1995 DISCONNECT BALLASTS $1,240 $0 Implemented
GT0560 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $50 Implemented
GT0560 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $680 $1,000 Not Implemented
GT0560 # 05 Y:1995 05 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,030 $5,000 Implemented
GT0559 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,650 $8,020 Not Implemented
GT0559 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,740 $2,470 Not Implemented
GT0559 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $500 Implemented
GT0559 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,510 $28,740 Implemented
GT0559 # 05 Y:1995 05 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,210 $13,650 Not Implemented
GT0559 # 06 Y:1995 06 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,050 $1,500 Implemented