IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0194 # 07 Y:2004 07 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,122 $2,975 Not Implemented
SU0190 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,548 $0 Implemented
SU0190 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,782 $0 Implemented
SU0190 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $205 $0 Implemented
SU0190 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $891 $180 Implemented
SU0190 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $97 $108 Implemented
SU0190 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $361 $500 Not Implemented
SU0190 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,329 $3,430 Not Implemented
SU0190 # 08 Y:2004 08 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,600 $19,500 Not Implemented
SU0191 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,017 $0 Implemented
SU0191 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $328 Not Implemented
SU0191 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,058 $25,000 Implemented
SU0191 # 04 Y:2004 04 2004 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $19,254 $38,185 Not Implemented
SU0191 # 05 Y:2004 05 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,413 $2,856 Implemented
SU0191 # 06 Y:2004 06 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,000 $7,400 Not Implemented
SU0188 # 01 Y:2004 01 2004 ADVERTISE PRODUCT OR SERVICE $10,418 $0 Implemented
SU0188 # 02 Y:2004 02 2004 PAY UTILITY BILLS ON TIME $1,203 $0 Implemented
SU0188 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $883 $0 Not Implemented
SU0188 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $184 Not Implemented
SU0188 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $5,424 $34,382 Not Implemented
SU0189 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,275 $0 Not Implemented
SU0189 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $0 Implemented
SU0189 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,291 $378 Implemented
SU0189 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,591 $1,175 Implemented
SU0189 # 05 Y:2004 05 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $49,312 $60,000 Implemented