IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0735 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,330 $550 Implemented
GT0735 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,556 $131,786 Implemented
GT0735 # 07 Y:2002 07 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,000 $0 Not Implemented
LL0135 # 01 Y:2002 01 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $546,668 $991,085 Not Implemented
TA0027 # 01 Y:2002 01 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $42,200 $85,300 Not Implemented
TA0027 # 02 Y:2002 02 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $39,800 $7,500 Implemented
TA0027 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $3,000 $268 Not Implemented
TA0027 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $4,783 $0 Implemented
TA0027 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $45 Implemented
TA0027 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $925 $615 Implemented
TA0027 # 07 Y:2002 07 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $840 $0 Not Implemented
TA0027 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $190 $160 Implemented
WI0419 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,499 $1,000 Implemented
WI0419 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,839 $5,926 Implemented
WI0419 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,475 $60 Implemented
WI0419 # 04 Y:2002 04 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $683 $500 Not Implemented
WI0419 # 05 Y:2002 05 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $424 $39 Implemented
WI0419 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $173 $0 Implemented
WI0419 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $299 $700 Implemented
UD0644 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $462,150 $500 Not Implemented
UD0644 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,360 $0 Implemented
UD0644 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,612 $0 Not Implemented
UD0644 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,397 $13,222 Not Implemented
UD0644 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,764 $2,775 Not Implemented
UD0644 # 06 Y:2002 06 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,953 $131 Implemented