Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0643 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $1,534 | $2,013 | Implemented |
WV0643 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $966 | $3,959 | Implemented |
WV0643 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $829 | $2,567 | Implemented |
WV0643 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $693 | $671 | Implemented |
WV0643 # 08 Y:2023 | 08 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $603 | $1,520 | Implemented |
WV0643 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $418 | $100 | Implemented |
WV0643 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $73 | $215 | Implemented |
NT0004 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,687 | $5,993 | Not Implemented |
NT0004 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $38,000 | $38,000 | Not Implemented |
NT0004 # 03 Y:2023 | 03 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $29,874 | $0 | Not Implemented |
NT0004 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $27,237 | $63,579 | Not Implemented |
NT0004 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $735 | $0 | Not Implemented |
NT0004 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,449 | $0 | Not Implemented |
NT0004 # 07 Y:2023 | 07 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $18,694 | $0 | Not Implemented |
LT8371 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,997 | $2,973 | n/a |
LT8371 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $69,836 | $1,164,586 | n/a |
LT8371 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,363 | $43,171 | n/a |
LT8371 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43 | $276 | n/a |
CI0013 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,809 | $305,300 | n/a |
CI0013 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,989 | $15,565 | n/a |
CI0013 # 03 Y:2023 | 03 | 2023 | REPLACE BOILER | $37,870 | $9,000 | n/a |
CI0013 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,121 | $0 | n/a |
CI0013 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,946 | $2,400 | n/a |
CI0013 # 06 Y:2023 | 06 | 2023 | USE PHOTOCELL CONTROLS | $15,628 | $2,250 | n/a |
CI0013 # 07 Y:2023 | 07 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $13,319 | $60,000 | n/a |