Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0182 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,441 | $12,707 | Implemented |
MI0182 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,940 | $10,000 | Implemented |
MI0182 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,913 | $40 | Implemented |
MI0182 # 04 Y:2009 | 04 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,610 | $2,000 | Implemented |
MI0182 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,694 | $1,210 | Implemented |
MI0182 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $7,828 | $13,850 | Not Implemented |
MI0182 # 07 Y:2009 | 07 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,590 | $10,746 | Not Implemented |
UF0426 # 14 Y:2009 | 14 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $1,083 | $0 | Not Implemented |
UF0426 # 15 Y:2009 | 15 | 2009 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $111,037 | $4,000 | Not Implemented |
UF0426 # 01 Y:2009 | 01 | 2009 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $20,276 | $4,000 | Not Implemented |
UF0426 # 02 Y:2009 | 02 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $146,810 | $3,192 | Not Implemented |
UF0426 # 03 Y:2009 | 03 | 2009 | RECYCLE FLUORESCENT LAMPS | $328 | $3,405 | Not Implemented |
UF0426 # 04 Y:2009 | 04 | 2009 | INSTALL SKYLIGHTS | $2,555 | $238 | Implemented |
UF0426 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $1,764 | $481 | Not Implemented |
UF0426 # 06 Y:2009 | 06 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $50,000 | $25,000 | Not Implemented |
UF0426 # 07 Y:2009 | 07 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,382 | $2,382 | Not Implemented |
UF0426 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234,287 | $67,220 | Not Implemented |
UF0426 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,528 | $628 | Implemented |
UF0426 # 10 Y:2009 | 10 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,591 | $568 | Not Implemented |
UF0426 # 11 Y:2009 | 11 | 2009 | INSTALL OCCUPANCY SENSORS | $24,539 | $0 | Not Implemented |
UF0426 # 12 Y:2009 | 12 | 2009 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $37,500 | $4,483 | Not Implemented |
UF0426 # 13 Y:2009 | 13 | 2009 | INSTALL COMMON HEADER ON COMPRESSORS | $229,898 | $0 | Not Implemented |
UF0425 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,286 | $0 | Not Implemented |
UF0425 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,129 | $456 | Implemented |
UF0425 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,944 | $21,313 | Implemented |