Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0212 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,685 | $25 | Implemented |
NC0212 # 02 Y:2001 | 02 | 2001 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $5,740 | $5,000 | Not Implemented |
NC0212 # 03 Y:2001 | 03 | 2001 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,554 | $11,000 | Not Implemented |
NC0212 # 04 Y:2001 | 04 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,456 | $800 | Not Implemented |
NC0212 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM THICKNESS INSULATION | $3,300 | $5,000 | Not Implemented |
NC0212 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $392 | $120 | Not Implemented |
NC0212 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,001 | $1,589 | Not Implemented |
NC0212 # 08 Y:2001 | 08 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,950 | $8,846 | Not Implemented |
NC0212 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,215 | $18,300 | Not Implemented |
NC0212 # 10 Y:2001 | 10 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,136 | $2,093 | Not Implemented |
NC0212 # 11 Y:2001 | 11 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $825 | $0 | Not Implemented |
MI0004 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,901 | $2,000 | Not Implemented |
MI0004 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $312 | Implemented |
MI0004 # 03 Y:2001 | 03 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $11,236 | $2,000 | Not Implemented |
MI0004 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $697 | $221 | Implemented |
MI0004 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $861 | $14 | Implemented |
MI0004 # 06 Y:2001 | 06 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,210 | $1,060 | Not Implemented |
MI0008 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,994 | $125 | n/a |
MI0008 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,780 | $87 | n/a |
MI0008 # 03 Y:2001 | 03 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,272 | $5 | n/a |
MI0008 # 04 Y:2001 | 04 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $22,533 | $40 | n/a |
MI0008 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $28,850 | $400 | n/a |
MI0008 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $78,789 | $44,200 | n/a |
MI0008 # 07 Y:2001 | 07 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $105,300 | $1,212 | n/a |
SD0277 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,030 | $1,720 | Implemented |