IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0334 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,226 $0 Implemented
WV0334 # 11 Y:2006 11 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $874 $145 Implemented
WV0334 # 12 Y:2006 12 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $401 $170 Implemented
OK0724 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $588 $322 Not Implemented
OK0724 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,492 $1,975 Not Implemented
OK0724 # 03 Y:2006 03 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,858 $4,100 Not Implemented
OK0724 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $380 $288 Not Implemented
OK0724 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $13,458 $0 Not Implemented
OK0724 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,235 $5,958 Not Implemented
OK0724 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,655 $2,592 Not Implemented
OK0724 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $169 $495 Not Implemented
OK0724 # 09 Y:2006 09 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $28,864 $61,416 Not Implemented
OK0724 # 10 Y:2006 10 2006 USE COMPRESSOR AIR FILTERS $2,647 $642 Not Implemented
OK0724 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,211 $5,963 Not Implemented
UF0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,929 $15,889 Not Implemented
UF0375 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,307 $33,550 Not Implemented
UF0375 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $85,158 $3,540 Implemented
UF0375 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,627 $180 Implemented
UF0375 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $129,429 $17,000 Implemented
UF0375 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,443 $49,050 Not Implemented
UF0375 # 07 Y:2006 07 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,590 $0 Implemented
UF0375 # 08 Y:2006 08 2006 DISCONNECT BALLASTS $2,018 $0 Implemented
UF0375 # 09 Y:2006 09 2006 INSTALL BACK-UP EQUIPMENT $1,160,914 $79,825 Not Implemented
TA0113 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,045 $24,738 Implemented
TA0113 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $370 Not Implemented