Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0309 # 01 Y:2007 | 01 | 2007 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $399,965 | $2,750,000 | Not Implemented |
MS0309 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,357 | $7,875 | Implemented |
MS0309 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,962 | $156 | Implemented |
MS0309 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,297 | $2,981 | Implemented |
MS0309 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $841 | $3,593 | Implemented |
MS0308 # 01 Y:2007 | 01 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $8,320 | $2,753 | Implemented |
MS0308 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,951 | $8,190 | Implemented |
MS0308 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,541 | $142 | Implemented |
MS0308 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,356 | $2,850 | Implemented |
MA0609 # 01 Y:2007 | 01 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,854 | $54,000 | Not Implemented |
MA0609 # 02 Y:2007 | 02 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $11,356 | $40,000 | Not Implemented |
MA0609 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,050 | $5,000 | Not Implemented |
MA0609 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,398 | $19,100 | Not Implemented |
MA0609 # 05 Y:2007 | 05 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,871 | $7,500 | Not Implemented |
MA0609 # 06 Y:2007 | 06 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,436 | $2,200 | Not Implemented |
MA0609 # 07 Y:2007 | 07 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,227 | $3,200 | Not Implemented |
MA0609 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,158 | $300 | Not Implemented |
MA0609 # 09 Y:2007 | 09 | 2007 | INSULATE BARE EQUIPMENT | $849 | $600 | Not Implemented |
MA0609 # 10 Y:2007 | 10 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $652 | $0 | Not Implemented |
SU0247 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,479 | $0 | Not Implemented |
SU0247 # 02 Y:2007 | 02 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $41,200 | $140 | Implemented |
SU0247 # 03 Y:2007 | 03 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,956 | $742 | Implemented |
SU0247 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,403 | $572 | Implemented |
SU0247 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,813 | $10,389 | Not Implemented |
SU0247 # 06 Y:2007 | 06 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $115 | $271 | Not Implemented |