IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0429 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,991 $0 Not Implemented
SF0429 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $228,512 $0 Not Implemented
UA0099 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109,678 $164,833 Not Implemented
UA0099 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $3,632 $242 Not Implemented
UA0099 # 03 Y:2013 03 2013 USE RADIANT HEATER FOR SPOT HEATING $25,020 $52,360 Not Implemented
UA0099 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $19,434 $14,980 Not Implemented
UA0099 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $5,000 Implemented
UA0099 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,883 $400 Not Implemented
UA0098 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $55,414 $35,390 Implemented
UA0098 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $51,977 $20,000 Implemented
UA0098 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,411 $3,500 Implemented
UA0098 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $69,733 $36,138 Not Implemented
UA0098 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,024 $34,540 Not Implemented
UA0098 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,139 $22,860 Not Implemented
SU0339 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $4,610 $0 Implemented
SU0339 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,664 $994 Not Implemented
SU0339 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,064 $125 Implemented
SU0339 # 04 Y:2013 04 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $18,079 $3,600 Implemented
SU0339 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $429 $152 Implemented
SU0339 # 06 Y:2013 06 2013 REDUCE VENTILATION AIR $1,471 $882 Not Implemented
SU0339 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,294 $2,093 Implemented
SU0339 # 08 Y:2013 08 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $35,885 $54,000 Not Implemented
SU0339 # 09 Y:2013 09 2013 ELIMINATE/REDUCE AN OPERATION $13,535 $19,680 Implemented
SU0339 # 10 Y:2013 10 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $716 $1,567 Not Implemented
SU0339 # 11 Y:2013 11 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,108 $20,639 Not Implemented