IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0064 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $1,640 Implemented
WM0064 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,738 $8,210 Not Implemented
WM0064 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,868 $3,500 Not Implemented
WM0064 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $11,151 $1,631 Not Implemented
WM0064 # 08 Y:2015 08 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,928 $34,000 Not Implemented
TT0157 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,147 $344,210 Not Implemented
TT0157 # 02 Y:2015 02 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $39,567 $0 Implemented
TT0157 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $32,298 $15,201 Implemented
TT0157 # 04 Y:2015 04 2015 USE OPTIMUM THICKNESS INSULATION $32,011 $40,000 Not Implemented
TT0157 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $26,007 $26,000 Implemented
TT0157 # 06 Y:2015 06 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,361 $9,500 Implemented
TT0157 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,293 $3,465 Implemented
TT0157 # 08 Y:2015 08 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $26,456 $157,989 Implemented
TT0157 # 09 Y:2015 09 2015 UPGRADE CONTROLS ON COMPRESSORS $26,246 $2,400 Implemented
TT0157 # 10 Y:2015 10 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,978 $1,000 Not Implemented
TT0157 # 11 Y:2015 11 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $958 $2,131 Not Implemented
TT0157 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $240 Implemented
BS0052 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,881 $3,501 Not Implemented
BS0052 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $3,691 $5,780 Not Implemented
BS0052 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,954 $40 Not Implemented
BS0052 # 04 Y:2015 04 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $12,564 $13,200 Not Implemented
BS0052 # 05 Y:2015 05 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,687 $3,800 Not Implemented
BS0052 # 06 Y:2015 06 2015 USE RADIANT HEATER FOR SPOT HEATING $3,310 $7,200 Not Implemented
BS0052 # 07 Y:2015 07 2015 COMBINE UTILITY METERS $810 $1,587 Not Implemented
BS0052 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,103 $17,841 Not Implemented