IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0121 # 05 Y:2022 05 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $31,088 $86,330 Implemented
CW0121 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $517 Implemented
CW0121 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,581 $0 Implemented
CW0121 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $925 $810 Not Implemented
CW0121 # 09 Y:2022 09 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $608 $165 Implemented
CW0121 # 10 Y:2022 10 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,639 $5,500 Implemented
CW0121 # 11 Y:2022 11 2022 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $545 $90 Not Implemented
CW0121 # 12 Y:2022 12 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $48,258 $14,344 Implemented
LE0519 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $971 $25 Implemented
LE0519 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,000 Implemented
LE0519 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,358 $85,000 Not Implemented
LE0519 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $835 $1,670 Implemented
LE0519 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,082 $16,800 Implemented
LE0519 # 06 Y:2022 06 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,038 $57,000 Not Implemented
OK1066 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $3,854 $7,908 Not Implemented
OK1066 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,182 $0 Not Implemented
OK1066 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,177 $23,400 Implemented
OK1066 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $399 $510 Not Implemented
OK1066 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,555 $0 Implemented
OK1066 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,995 $191,438 Not Implemented
SU0510 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,555 $0 Not Implemented
SU0510 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $444 $0 Not Implemented
SU0510 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $898 $44 Not Implemented
SU0510 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $134 Not Implemented
SU0510 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $794 $383 Not Implemented