Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0130 # 17 Y:1984 | 17 | 1984 | INSULATE BARE EQUIPMENT | $1,757 | $2,100 | Not Implemented |
KU0130 # 18 Y:1984 | 18 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
KU0130 # 19 Y:1984 | 19 | 1984 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $262 | $0 | Implemented |
KU0130 # 20 Y:1984 | 20 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $105 | $0 | Implemented |
KU0128 # 01 Y:1984 | 01 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,484 | $300 | Implemented |
KU0128 # 02 Y:1984 | 02 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $4,147 | $3,200 | Implemented |
KU0128 # 03 Y:1984 | 03 | 1984 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $2,531 | $178 | Not Implemented |
KU0128 # 04 Y:1984 | 04 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,023 | $1,273 | Implemented |
KU0128 # 05 Y:1984 | 05 | 1984 | KEEP BOILER TUBES CLEAN | $942 | $64 | Implemented |
KU0128 # 06 Y:1984 | 06 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $876 | $1,200 | Not Implemented |
KU0128 # 07 Y:1984 | 07 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $268 | $50 | Implemented |
KU0125 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $3,948 | $0 | Implemented |
KU0125 # 02 Y:1984 | 02 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $2,056 | $0 | Implemented |
KU0125 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $267 | $0 | Implemented |
KU0125 # 04 Y:1984 | 04 | 1984 | INSTALL TURBULATORS | $307 | $659 | Not Implemented |
KU0125 # 05 Y:1984 | 05 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,112 | $5,027 | Implemented |
KU0125 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,145 | $6,502 | Not Implemented |
KU0125 # 07 Y:1984 | 07 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $397 | $0 | Implemented |
KU0125 # 08 Y:1984 | 08 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $212 | $264 | Implemented |
KU0126 # 01 Y:1984 | 01 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $598 | $1,200 | Not Implemented |
KU0126 # 02 Y:1984 | 02 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,038 | $0 | Implemented |
KU0126 # 03 Y:1984 | 03 | 1984 | INSTALL SET-BACK TIMERS | $3,890 | $945 | Not Implemented |
KU0126 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $219 | $0 | Implemented |
KU0126 # 05 Y:1984 | 05 | 1984 | INSTALL TURBULATORS | $162 | $441 | Not Implemented |
KU0126 # 06 Y:1984 | 06 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $369 | $0 | Implemented |