Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0233 # 05 Y:2006 | 05 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,990 | $3,000 | Not Implemented |
LE0233 # 06 Y:2006 | 06 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,416 | $2,500 | Not Implemented |
LE0233 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $881 | $197 | Not Implemented |
LE0233 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $789 | $1,000 | Not Implemented |
LE0233 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $465 | $375 | Not Implemented |
LE0233 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,514 | $12,000 | Implemented |
LE0232 # 01 Y:2006 | 01 | 2006 | MODIFY WORKLOAD | $35,100 | $3,200 | Not Implemented |
LE0232 # 02 Y:2006 | 02 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,102 | $38,465 | Not Implemented |
LE0232 # 03 Y:2006 | 03 | 2006 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $7,750 | $3,510 | Not Implemented |
LE0232 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,787 | $500 | Not Implemented |
LE0232 # 05 Y:2006 | 05 | 2006 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,612 | $620 | Not Implemented |
LE0232 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $809 | $60 | Not Implemented |
LE0232 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $363 | $500 | Not Implemented |
LE0232 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $7,549 | $2,440 | Not Implemented |
LE0232 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,445 | $51,983 | Not Implemented |
LE0231 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $140,853 | $660,000 | Not Implemented |
LE0231 # 02 Y:2006 | 02 | 2006 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $128,263 | $120,000 | Not Implemented |
LE0231 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,942 | $13,500 | Implemented |
LE0231 # 04 Y:2006 | 04 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,565 | $51,000 | Implemented |
LE0231 # 05 Y:2006 | 05 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $21,498 | $4,500 | Implemented |
LE0231 # 06 Y:2006 | 06 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $17,212 | $12,500 | Implemented |
LE0231 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $16,394 | $13,060 | Not Implemented |
LE0231 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,127 | $400 | Implemented |
LE0231 # 09 Y:2006 | 09 | 2006 | IMPROVE COMBUSTION CONTROL CAPABILITY | $7,881 | $2,500 | Implemented |
LE0231 # 10 Y:2006 | 10 | 2006 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,915 | $189 | Implemented |