IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0305 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $1,508 $5,569 Not Implemented
MA0305 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $0 Implemented
MA0305 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $764 $180 Implemented
MA0305 # 07 Y:1994 07 1994 RECYCLE WASTE INK AND CLEANUP SOLVENT $24,185 $2,500 Not Implemented
MA0305 # 08 Y:1994 08 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,350 $385 Not Implemented
MA0308 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $87,650 $18,145 Implemented
MA0308 # 02 Y:1994 02 1994 REPAIR OR REPLACE STEAM TRAPS $19,471 $813 Implemented
MA0308 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,420 $7,745 Not Implemented
MA0308 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $441 $110 Implemented
BD0009 # 01 Y:1994 01 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,608 $12,904 Not Implemented
BD0009 # 02 Y:1994 02 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,553 $5,412 Not Implemented
BD0009 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,666 $1,430 Implemented
BD0009 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $226 $100 Implemented
BD0009 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,608 $1,500 Not Implemented
AS0119 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $945 $350 Implemented
AS0119 # 02 Y:1994 02 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $574 $700 Not Implemented
AS0119 # 03 Y:1994 03 1994 USE HEAT PUMP FOR SPACE CONDITIONING $3,935 $15,000 Implemented
AS0119 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $469 $250 Implemented
AS0119 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,018 $10,881 Not Implemented
AS0119 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $295 $438 Not Implemented
AS0119 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $138 $140 Implemented
ME0133 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $2,688 $4,500 Not Implemented
ME0133 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,453 $6,650 Not Implemented
ME0133 # 03 Y:1994 03 1994 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $5,276 $7,200 Not Implemented
AR0024 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,495 $210 Implemented