Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0277 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,552 | $100,000 | Not Implemented |
SD0277 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,030 | $5,000 | Not Implemented |
SD0277 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $3,000 | Not Implemented |
SD0277 # 05 Y:2001 | 05 | 2001 | INSTALL SKYLIGHTS | $12,773 | $26,500 | Not Implemented |
SD0277 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,765 | $4,674 | Not Implemented |
SD0277 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $3,648 | $7,000 | Implemented |
SD0277 # 08 Y:2001 | 08 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,680 | $6,000 | Not Implemented |
SD0277 # 09 Y:2001 | 09 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,947 | $5,400 | Not Implemented |
SD0277 # 10 Y:2001 | 10 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $12,060 | $20,000 | Not Implemented |
SD0277 # 11 Y:2001 | 11 | 2001 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $2,383 | $2,000 | Implemented |
SD0277 # 12 Y:2001 | 12 | 2001 | MINIMIZE WATER USAGE | $35,500 | $15,000 | Not Implemented |
SD0277 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $337,800 | $640,000 | Not Implemented |
SD0277 # 14 Y:2001 | 14 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $25,200 | $25,000 | Not Implemented |
MA0486 # 01 Y:2001 | 01 | 2001 | ELIMINATE SHIFT | $19,200 | $0 | Not Implemented |
MA0486 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,500 | $800 | Implemented |
MA0486 # 03 Y:2001 | 03 | 2001 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,300 | $25,000 | Not Implemented |
MA0486 # 04 Y:2001 | 04 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,300 | $0 | Implemented |
MA0486 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,700 | $5,000 | Implemented |
MA0486 # 06 Y:2001 | 06 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,400 | $8,000 | Not Implemented |
MA0486 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $900 | $350 | Implemented |
MA0486 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $800 | $1,100 | Implemented |
MA0486 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $300 | $2,000 | Not Implemented |
NC0215 # 01 Y:2001 | 01 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,150 | $1,000 | Not Implemented |
NC0215 # 02 Y:2001 | 02 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $1,330 | $4,000 | Not Implemented |
NC0215 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $91 | $65 | Not Implemented |