IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0277 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,552 $100,000 Not Implemented
SD0277 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $11,030 $5,000 Not Implemented
SD0277 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $930 $3,000 Not Implemented
SD0277 # 05 Y:2001 05 2001 INSTALL SKYLIGHTS $12,773 $26,500 Not Implemented
SD0277 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,765 $4,674 Not Implemented
SD0277 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $3,648 $7,000 Implemented
SD0277 # 08 Y:2001 08 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,680 $6,000 Not Implemented
SD0277 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,947 $5,400 Not Implemented
SD0277 # 10 Y:2001 10 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,060 $20,000 Not Implemented
SD0277 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $2,383 $2,000 Implemented
SD0277 # 12 Y:2001 12 2001 MINIMIZE WATER USAGE $35,500 $15,000 Not Implemented
SD0277 # 13 Y:2001 13 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $337,800 $640,000 Not Implemented
SD0277 # 14 Y:2001 14 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $25,200 $25,000 Not Implemented
MA0486 # 01 Y:2001 01 2001 ELIMINATE SHIFT $19,200 $0 Not Implemented
MA0486 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,500 $800 Implemented
MA0486 # 03 Y:2001 03 2001 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,300 $25,000 Not Implemented
MA0486 # 04 Y:2001 04 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,300 $0 Implemented
MA0486 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,700 $5,000 Implemented
MA0486 # 06 Y:2001 06 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,400 $8,000 Not Implemented
MA0486 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $350 Implemented
MA0486 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $1,100 Implemented
MA0486 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $300 $2,000 Not Implemented
NC0215 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,150 $1,000 Not Implemented
NC0215 # 02 Y:2001 02 2001 AIR CONDITION ONLY SPACE NECESSARY $1,330 $4,000 Not Implemented
NC0215 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $91 $65 Not Implemented