IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0260 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $5,118 $6,900 Implemented
BD0260 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,159 $1,159 Implemented
BD0260 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,427 $3,000 Implemented
BD0260 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,226 $1,000 Implemented
BD0260 # 07 Y:2004 07 2004 INSTALL TURBULATORS $1,553 $3,500 Implemented
BD0260 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $656 Implemented
BD0260 # 09 Y:2004 09 2004 INSTALL AUTOMATIC STACK DAMPER $991 $1,500 Implemented
BD0260 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $551 Implemented
BD0260 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $312 $670 Implemented
BD0260 # 12 Y:2004 12 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $377 $1,000 Implemented
BD0260 # 13 Y:2004 13 2004 USE POWER DURING OFF-PEAK PERIODS $1,766 $0 Implemented
GT0783 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,670 $3,000 Not Implemented
GT0783 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $1,250 Implemented
GT0783 # 03 Y:2004 03 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,110 $3,700 Not Implemented
GT0783 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $35,410 $0 Implemented
GT0783 # 05 Y:2004 05 2004 METER WASTE WATER $33,200 $2,000 Implemented
GT0783 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,190 $1,020 Implemented
GT0783 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,242 $20,982 Implemented
GT0783 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,875 $655 Implemented
GT0783 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $5,000 $1,500 Implemented
MS0251 # 01 Y:2004 01 2004 BURN WOOD BY-PRODUCTS FOR HEAT $15,964 $32,907 Not Implemented
MS0251 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,330 $1,557 Implemented
MS0251 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $4,808 $9,850 Implemented
MS0251 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,806 $715 Implemented
MS0251 # 05 Y:2004 05 2004 AIR CONDITION ONLY SPACE NECESSARY $3,119 $800 Not Implemented