Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0783 # 03 Y:2004 | 03 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,110 | $3,700 | Not Implemented |
GT0783 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $35,410 | $0 | Implemented |
GT0783 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $33,200 | $2,000 | Implemented |
GT0783 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,190 | $1,020 | Implemented |
GT0783 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,242 | $20,982 | Implemented |
GT0783 # 08 Y:2004 | 08 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,875 | $655 | Implemented |
GT0783 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $5,000 | $1,500 | Implemented |
MS0251 # 01 Y:2004 | 01 | 2004 | BURN WOOD BY-PRODUCTS FOR HEAT | $15,964 | $32,907 | Not Implemented |
MS0251 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,330 | $1,557 | Implemented |
MS0251 # 03 Y:2004 | 03 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $4,808 | $9,850 | Implemented |
MS0251 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,806 | $715 | Implemented |
MS0251 # 05 Y:2004 | 05 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $3,119 | $800 | Not Implemented |
MS0251 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,467 | $830 | Not Implemented |
MS0251 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $798 | $334 | Implemented |
MS0251 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $792 | $1,346 | Not Implemented |
MS0251 # 09 Y:2004 | 09 | 2004 | USE SYNTHETIC LUBRICANT | $757 | $176 | Implemented |
MS0251 # 10 Y:2004 | 10 | 2004 | DISCONNECT BALLASTS | $260 | $708 | Implemented |
BD0260 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,265 | $0 | Implemented |
BD0260 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,158 | $900 | Implemented |
BD0260 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $5,118 | $6,900 | Implemented |
BD0260 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,159 | $1,159 | Implemented |
BD0260 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,427 | $3,000 | Implemented |
BD0260 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,226 | $1,000 | Implemented |
BD0260 # 07 Y:2004 | 07 | 2004 | INSTALL TURBULATORS | $1,553 | $3,500 | Implemented |
BD0260 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,267 | $656 | Implemented |