IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0424 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,138 $14,750 Not Implemented
SD0424 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $16,270 Not Implemented
SD0424 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,490 $10,074 Not Implemented
SD0424 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $8,162 $31,629 Not Implemented
SU0288 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,422 $0 Implemented
SU0288 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,730 $710 Implemented
SU0288 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,392 $2,257 Implemented
SU0288 # 04 Y:2010 04 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $50,239 $171,000 Implemented
SU0288 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $161 $729 Implemented
SD0424 # 01 Y:2010 01 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $67,934 $1,710 Implemented
SD0424 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,306 $7,308 Implemented
AM0568 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $55,000 $46,000 Not Implemented
AM0568 # 02 Y:2010 02 2010 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $43,900 $0 Not Implemented
AM0568 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $22,400 $54,380 Not Implemented
AM0568 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,780 $500 Not Implemented
AM0568 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,655 $2,000 Not Implemented
AM0568 # 06 Y:2010 06 2010 INSTALL SKYLIGHTS $4,820 $13,100 Not Implemented
AM0568 # 07 Y:2010 07 2010 REPAIR OR REPLACE STEAM TRAPS $2,920 $1,845 Not Implemented
AM0568 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,340 $9,176 Not Implemented
AM0568 # 09 Y:2010 09 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,330 $0 Not Implemented
AM0568 # 10 Y:2010 10 2010 PAY BILLS ON TIME TO AVOID LATE FEES $2,282 $0 Not Implemented
AM0568 # 11 Y:2010 11 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,010 $0 Not Implemented
BD0367 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,090 $19,121 Not Implemented
BD0367 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $803 $450 Not Implemented
BD0367 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $450 Not Implemented