Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0147 # 06 Y:2019 | 06 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $130 | $0 | Implemented |
UU0147 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $433 | $400 | Implemented |
UU0146 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $37,500 | $225,000 | Not Implemented |
UU0146 # 02 Y:2019 | 02 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,186 | $2,000 | Not Implemented |
UU0146 # 03 Y:2019 | 03 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,780 | $0 | Implemented |
UU0146 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $350 | Not Implemented |
UU0146 # 05 Y:2019 | 05 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $850 | $0 | Not Implemented |
UU0146 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $693 | $2,575 | Not Implemented |
UU0146 # 07 Y:2019 | 07 | 2019 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $367 | $1,200 | Not Implemented |
UU0146 # 08 Y:2019 | 08 | 2019 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $231 | $1,100 | Not Implemented |
UU0146 # 09 Y:2019 | 09 | 2019 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $97 | $75 | Implemented |
UU0146 # 10 Y:2019 | 10 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,482 | $1,000 | Not Implemented |
IC0210 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $156,049 | $91,000 | Not Implemented |
IC0210 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,726 | $8,414 | Not Implemented |
IC0210 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,962 | $2,550 | Not Implemented |
IC0210 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,892 | $3,797 | Not Implemented |
AS0464 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $59,350 | $126,000 | Implemented |
AS0464 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT FOR HEAT | $48,323 | $319,500 | Not Implemented |
AS0464 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,226 | $2,867 | Not Implemented |
AS0464 # 04 Y:2019 | 04 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $15,760 | $26,200 | Not Implemented |
AS0464 # 05 Y:2019 | 05 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,910 | $3,232 | Not Implemented |
AS0464 # 06 Y:2019 | 06 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $3,137 | $348 | Implemented |
AS0463 # 01 Y:2019 | 01 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $56,524 | $90,000 | Implemented |
AS0463 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,405 | $2,867 | Not Implemented |
AS0463 # 03 Y:2019 | 03 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $11,257 | $18,720 | Not Implemented |