Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,100
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0181 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,480 | $10,375 | Implemented |
DL0180 # 01 Y:2020 | 01 | 2020 | REDUCE VENTILATION AIR | $26,710 | $0 | Implemented |
DL0180 # 02 Y:2020 | 02 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $980 | $120 | Implemented |
DL0180 # 03 Y:2020 | 03 | 2020 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,450 | $400 | Implemented |
DL0180 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,160 | $1,600 | Not Implemented |
DL0180 # 05 Y:2020 | 05 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,970 | $5,800 | Not Implemented |
DL0180 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,050 | $4,000 | Not Implemented |
DL0180 # 07 Y:2020 | 07 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $53,460 | $2,400 | Not Implemented |
DL0180 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,080 | $1,900 | Implemented |
DL0180 # 09 Y:2020 | 09 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $610 | $900 | Implemented |
DL0179 # 01 Y:2020 | 01 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,390 | $2,500 | Implemented |
DL0179 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $7,410 | $6,500 | Not Implemented |
DL0179 # 03 Y:2020 | 03 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $5,600 | $600 | Implemented |
DL0179 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,200 | $17,000 | Not Implemented |
DL0179 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,580 | $15,000 | Implemented |
DL0179 # 06 Y:2020 | 06 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,500 | $11,625 | Implemented |
DL0179 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,250 | $13,450 | Implemented |
DL0179 # 08 Y:2020 | 08 | 2020 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $65,500 | $47,500 | Not Implemented |
DL0178 # 01 Y:2020 | 01 | 2020 | RECOVER AND REUSE COOLING WATER | $13,590 | $4,000 | Not Implemented |
DL0178 # 02 Y:2020 | 02 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $470 | $750 | Not Implemented |
DL0178 # 03 Y:2020 | 03 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $640 | $60 | Not Implemented |
DL0178 # 04 Y:2020 | 04 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $18,880 | $10,000 | Not Implemented |
DL0178 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $910 | $1,000 | Not Implemented |
DL0178 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,720 | $2,500 | Not Implemented |
DL0178 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,900 | $2,750 | Not Implemented |