IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0359 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18,570 $0 Implemented
GT0359 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $830 $320 Not Implemented
GT0359 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $700 $500 Implemented
GT0360 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,520 $0 Implemented
GT0360 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,950 $1,800 Implemented
GT0360 # 03 Y:1988 03 1988 DISCONNECT BALLASTS $210 $230 Not Implemented
GT0360 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,741 $21,965 Implemented
GT0360 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $2,080 Not Implemented
GT0360 # 06 Y:1988 06 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $490 $500 Implemented
GT0361 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $50 Not Implemented
GT0361 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $7,330 $2,140 Not Implemented
GT0361 # 03 Y:1988 03 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $260 $450 Not Implemented
GT0361 # 04 Y:1988 04 1988 USE MINIMUM SAFE OVEN VENTILATION $2,080 $250 Not Implemented
GT0361 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $202 $518 Not Implemented
GT0361 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,460 $2,000 Not Implemented
GT0362 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,860 $9,000 Not Implemented
GT0362 # 02 Y:1988 02 1988 REPAIR OR REPLACE STEAM TRAPS $5,850 $250 Implemented
GT0362 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $2,770 $2,770 Implemented
GT0362 # 04 Y:1988 04 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,800 $8,200 Implemented
GT0362 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $3,300 Implemented
GT0362 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,500 $3,500 Implemented
GT0362 # 07 Y:1988 07 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $146 Implemented
GT0362 # 08 Y:1988 08 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18 $0 Implemented
GT0363 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,945 $200 Not Implemented
GT0363 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $370 Not Implemented