IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0194 # 01 Y:1993 01 1993 KEEP BOILER TUBES CLEAN $23,338 $2,500 Implemented
OR0194 # 02 Y:1993 02 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $6,588 $2,790 Not Implemented
OR0194 # 03 Y:1993 03 1993 REDUCE FLUID FLOW RATES $17,513 $22,030 Implemented
OR0194 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,410 $9,422 Not Implemented
OR0194 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,934 $20,000 Implemented
OR0194 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,898 $11,300 Not Implemented
OR0194 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $8,554 Not Implemented
OR0194 # 08 Y:1993 08 1993 OPTIMIZE PLANT POWER FACTOR $2,088 $6,000 Not Implemented
MO0103 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,408 $8,467 Implemented
MO0103 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,255 $230 Implemented
MO0103 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,608 $4,638 Not Implemented
MO0103 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,379 $319 Implemented
MO0103 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,464 $180 Implemented
MO0103 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,717 $1,497 Not Implemented
MO0103 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,195 $1,195 Implemented
GT0509 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,748 $4,884 Not Implemented
GT0509 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $473 $0 Implemented
GT0509 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $158 $195 Not Implemented
GT0509 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,370 $4,820 Implemented
GT0509 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $137 $0 Not Implemented
GT0509 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,569 $450 Implemented
GT0509 # 07 Y:1993 07 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,341 $21,050 Implemented
GT0509 # 08 Y:1993 08 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $281 $9,800 Implemented
AM0192 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,950 $12,850 Implemented
AM0192 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,640 $5,500 Not Implemented