Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0135 # 01 Y:1995 | 01 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,947 | $1,500 | Not Implemented |
UF0135 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,929 | $1,727 | Not Implemented |
UF0135 # 03 Y:1995 | 03 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,778 | $17,592 | Not Implemented |
UF0135 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,379 | $350 | Not Implemented |
UF0135 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,059 | $846 | Not Implemented |
UF0135 # 06 Y:1995 | 06 | 1995 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $23,780 | $15,700 | Not Implemented |
UF0135 # 07 Y:1995 | 07 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $31,315 | $4,200 | Not Implemented |
OK0478 # 01 Y:1995 | 01 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $63,653 | $25,000 | Implemented |
OK0478 # 02 Y:1995 | 02 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,374 | $48,000 | Implemented |
OK0478 # 03 Y:1995 | 03 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,482 | $2,520 | Not Implemented |
OK0478 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,490 | $2,500 | Not Implemented |
OK0478 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,792 | $160 | Not Implemented |
OK0478 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,382 | $1,650 | Not Implemented |
OK0478 # 07 Y:1995 | 07 | 1995 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,143 | $1,000 | Not Implemented |
OK0478 # 08 Y:1995 | 08 | 1995 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,578 | $1,000 | Implemented |
OK0478 # 09 Y:1995 | 09 | 1995 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $8,089 | $4,295 | Implemented |
OK0478 # 10 Y:1995 | 10 | 1995 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $6,080 | $500 | Implemented |
OK0478 # 11 Y:1995 | 11 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,300 | $0 | Implemented |
OR0254 # 01 Y:1995 | 01 | 1995 | OPTIMIZE PLANT POWER FACTOR | $2,665 | $2,500 | Not Implemented |
OR0254 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,069 | $2,353 | Implemented |
OR0254 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $525 | $425 | Implemented |
OR0254 # 04 Y:1995 | 04 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,477 | $0 | Not Implemented |
OR0254 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,247 | $0 | Not Implemented |
OR0254 # 06 Y:1995 | 06 | 1995 | UPGRADE CONTROLS ON COMPRESSORS | $1,648 | $200 | Not Implemented |
OR0254 # 07 Y:1995 | 07 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,299 | $0 | Implemented |