Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0237 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,210 | $654 | Not Implemented |
MS0237 # 07 Y:2003 | 07 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $430 | $752 | Implemented |
MA0544 # 01 Y:2003 | 01 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,663 | $2,000 | Implemented |
MA0544 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,425 | $2,000 | Not Implemented |
MA0544 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,646 | $6,156 | Implemented |
MA0544 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $1,236 | $600 | Not Implemented |
MA0544 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $543 | $20 | Implemented |
TA0065 # 01 Y:2003 | 01 | 2003 | REDESIGN PROCESS | $75,086 | $0 | Implemented |
TA0065 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $64,800 | $5,200 | Implemented |
TA0065 # 03 Y:2003 | 03 | 2003 | USE "WASH-LESS" PROCESSING EQUIPMENT | $49,000 | $1,768 | Not Implemented |
TA0065 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $37,440 | $1,027 | Not Implemented |
TA0065 # 05 Y:2003 | 05 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,900 | $0 | Implemented |
TA0065 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,426 | $6,000 | Implemented |
TA0065 # 07 Y:2003 | 07 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,793 | $0 | Implemented |
TA0065 # 08 Y:2003 | 08 | 2003 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,422 | $1,894 | Implemented |
TA0065 # 09 Y:2003 | 09 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $306 | $140 | Implemented |
TA0065 # 10 Y:2003 | 10 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $194 | $0 | Not Implemented |
TA0065 # 11 Y:2003 | 11 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $146 | $142 | Not Implemented |
OK0675 # 03 Y:2003 | 03 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,171 | $2,000 | Implemented |
OK0675 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,210 | $2,000 | Not Implemented |
OK0675 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $565 | $367 | Implemented |
OK0675 # 06 Y:2003 | 06 | 2003 | OPTIMIZE PLANT POWER FACTOR | $428 | $2,730 | Not Implemented |
OK0675 # 07 Y:2003 | 07 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,672 | $2,173 | Not Implemented |
OK0675 # 08 Y:2003 | 08 | 2003 | INSTALL SET-BACK TIMERS | $1,993 | $0 | Not Implemented |
OK0675 # 09 Y:2003 | 09 | 2003 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $14,350 | $23,640 | Not Implemented |