IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0318 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3 $11,928 Not Implemented
SF0318 # 06 Y:2005 06 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $20 $80,000 Not Implemented
SF0318 # 07 Y:2005 07 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $818 $3,200 Implemented
SF0318 # 08 Y:2005 08 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13 $10,000 Implemented
SF0318 # 09 Y:2005 09 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4 $16,945 Not Implemented
UU0094 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $380 Not Implemented
UU0094 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,260 $7,000 Not Implemented
UU0094 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $220 Not Implemented
UU0094 # 04 Y:2005 04 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,540 $0 Not Implemented
UU0094 # 05 Y:2005 05 2005 USE OPTIMUM THICKNESS INSULATION $110 $150 Not Implemented
GT0813 # 01 Y:2005 01 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,381 $0 Implemented
GT0813 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,360 $8,000 Not Implemented
GT0813 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,172 $565 Not Implemented
GT0813 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,158 $41,528 Implemented
GT0813 # 05 Y:2005 05 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,836 $0 Not Implemented
GT0813 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $22,247 $0 Implemented
GT0813 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,974 $1,250 Implemented
GT0813 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,865 $3,500 Not Implemented
MS0285 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $147,024 $1,342,000 Not Implemented
MS0285 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,445 $575 Not Implemented
MS0285 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,503 $138 Implemented
MS0285 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,062 $151 Implemented
MS0285 # 05 Y:2005 05 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $671 $972 Not Implemented
SU0223 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,360 $0 Not Implemented
SU0223 # 02 Y:2005 02 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,040 $0 Not Implemented