Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0319 # 06 Y:2021 | 06 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $13,167 | $45,756 | Implemented |
MZ0319 # 07 Y:2021 | 07 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $22,855 | $145,659 | Not Implemented |
MZ0319 # 08 Y:2021 | 08 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,401 | $25,720 | Implemented |
MZ0319 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,480 | $3,480 | Not Implemented |
MI0397 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,589 | $480 | Not Implemented |
MI0397 # 02 Y:2021 | 02 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $2,751 | $480 | Not Implemented |
MI0397 # 03 Y:2021 | 03 | 2021 | METER WASTE WATER | $2,172 | $1,380 | Not Implemented |
MI0397 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,160 | $4,555 | Not Implemented |
MI0397 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,631 | $40 | Implemented |
MI0397 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,361 | $40 | Implemented |
WM0169 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,165 | $21,350 | Not Implemented |
WM0169 # 02 Y:2021 | 02 | 2021 | USE SYNTHETIC LUBRICANT | $4,530 | $3,000 | Not Implemented |
WM0169 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,251 | $0 | Not Implemented |
WM0169 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,969 | $4,800 | Implemented |
WM0169 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,662 | $8,830 | Not Implemented |
WM0169 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,352 | $2,425 | Implemented |
WM0169 # 07 Y:2021 | 07 | 2021 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $920 | $2,140 | Not Implemented |
SD0619 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,059 | $4,547 | Implemented |
SD0619 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,715 | $4,000 | Not Implemented |
SD0619 # 03 Y:2021 | 03 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,606 | $387,000 | Not Implemented |
MI0396 # 01 Y:2021 | 01 | 2021 | PAY UTILITY BILLS ON TIME | $27,408 | $0 | Implemented |
MI0396 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $27,588 | $100 | Not Implemented |
MI0396 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,464 | $3,060 | Not Implemented |
MI0396 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,908 | $2,020 | Implemented |
MI0396 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,263 | $1,487 | Not Implemented |