Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,838
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0049 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,577 | $109,805 | n/a |
TR0049 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,525 | $3,675 | n/a |
TR0049 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,612 | $2,500 | n/a |
UF0606 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $188,564 | $146,067 | n/a |
UF0606 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,322 | $322,608 | n/a |
UF0606 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,799 | $79,800 | n/a |
UF0606 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,430 | $25,350 | n/a |
UF0606 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,283 | $0 | n/a |
UF0606 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $214,485 | $60,000 | n/a |
UL2315 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,703 | $150,942 | n/a |
UL2315 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,783 | $12,225 | n/a |
UL2315 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,528 | $1,620 | n/a |
UL2315 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,612 | $8,564 | n/a |
UL2315 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $2,583 | $1,264 | n/a |
UL2315 # 06 Y:2023 | 06 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,527 | $31,200 | n/a |
UW2319 # 01 Y:2023 | 01 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $56,470 | $23,651 | n/a |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | n/a |
UW2319 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,001 | $2,820 | n/a |
UW2319 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,443 | $68,000 | n/a |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | n/a |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | n/a |
UA0282 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $3,672 | $165 | n/a |
UA0282 # 02 Y:2023 | 02 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,292 | $5,675 | n/a |
UA0282 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,197 | $297 | n/a |
UA0282 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $927 | $1,176 | n/a |